ERW Black Oil and Gas Pipe

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hebei

  • Validity to:

    Long-term effective

  • Last update:

    2020-01-25 17:46

  • Browse the number:

    169

Send an inquiries

Company Profile

Tangshan Lianchuang Steel Making Science and Technology Co., Ltd

By certification [File Integrity]

Contact:tangshanlianchuang(Mr.)  

Email:

Telephone:

Phone:

Area:Hebei

Address:Hebei

Website:http://www.tslcsteels.com/ http://tangshanlianchuang.weijia-group.com/

Product details

Usage/Application

Mechanical & manufacture, Steel structure, Shipbuilding, Bridging ,Automobile chassis, Industrial water lines/ plant piping, Vehicular chassis and frames, Idlers & belt conveyors Agriculture and Irrigation, Scaffoldings, Electrical Cable conduits, Cooling towers, Antenna and Telecom Towers, Cold storages, Tabular poles Fire Protection Systems, HVAC, Plumbing, Fabrication industry,  Food Processing, Pharmaceutical, Petrochemical, Chemical, Machine Building, Automobile.


Production description


Surface

Galvanized, 3PE, Painting, Coating Oil, Steel Stamp, Drilling, Etc

Packing

Packing In Bundle With Steel Strips; With Seaworthy Package At The End; Could Be Done With Your Requirement.

Inspection

With Chemical Composition And Mechanical Properties Testing; Hydrostatic Test, Dimensional And Visual Inspection, With Nondestructive Inspection

Certification

BV, IAF, SGS,COC, ISO Or As Per Customer

Application

Urban/Civil Construction Pipe, Machine Structure Pipe, Agriculture Equipment Pipe, Water And Gas Pipe, Greenhouse Pipe, Scaffolding Pipe, Building Material Tube, Furniture Tube, Low Pressure Fluid Tube, Oil Pipe, Etc

Trade Terms

FOB, CFR, CIF, EXW, Etc.

Payment

L/C, D/A, D/P, T/P Western Union, MoneyGram Acceptable, T/T Preferred

Delivery Time

Usually Within 10-30 Days After Receipt Of Deposit, ASAP

Loading Port

Xingang , Tianjin


http://www.tslcsteels.com/