Plastic Auto Car Radiator Grille Injection Mould

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2020-03-27 10:25

  • Browse the number:

    173

Send an inquiries

Company Profile

Zhejiang Kaihao Plastic Mold Co., Ltd

By certification [File Integrity]

Contact:kaihao(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.kaihaomold.com/ http://kaihao.weijia-group.com/

Product details

High Precision Customized Plastic Auto Radiator Grille Mould/Mold for car

Detailed Product Description:

Plastic moulding

1). Competitive price.

2). Continuance service and support.

3). Customer design and R&D program coordination.

4). ISO standard

5). Application expertise.

6). Quality,reliability and long product life.


TECHNICAL SPECIFICATIONS

Type of mould

Injection mould

Small,medium,large mold

Mold Material

S136, P20, 718H , 2738 , NAK80 ,1.2311 etc

Nr of Cavities

1+1,1+2+1,2+2,4+4,Single or mutilcativies

Cycle time

10-30seconds

Injection machine

90-1000ton

Life span of mold

300k-1000k

Shrinkage

According to material

Product Material

PE , PP, HDPE , PPR , PVC , PP , PS , PET , ABS , PC , etc

Injection Type

Hot Runner

QTY of Drops

Cold Runner

Hot sprue,Sequential Injection

Gate Point

Edge gate, Pin point gate, Sub gates, Fan gate, bayer

Ejection

Round Ejector Pin

Slider

Outer, inner slider, lifter

Surface finish

Tech polish, High gloss, Texture,VDI 3400

Mould hot treatment

Tempering , Quending , Nitriding

Main Processing Equipment

Sodick, Seiki, CNC , high speed carve , EDM ,wire cut , drill


Company Information:

KaiHao mold Is a rapid integration of industry and trade enterprises. We focus on plastic injection moulds.

1. Factory area 6,500 square meters which consists injection mold assemble workshop, CNC workshop, injection mold tooling testing workshop and mass order producing workshop.

2. Production workers and sales more than 100 persons.

3. 2 after-sale service department

4.There are large and small injection mold machines, milling machines, grinding machines, CNC lathes, EDM machines, wire cutting machines, total 36 machines for plastic injection mould tooling and plastic part producing

5. Providing one stop service from plastic injection mould 3 d drawing to plastic product production.



Our Certifications:


KaiHao Mold Location:


1.From Ningbo by train 1 hour.

2.From Yiwu by bus 3 hours.

3.From Shanghai by train 4 hours.

4.From Guangzhou by air 2 hours.


FAQ:

Q1: Do you build hot runner plastic moulds?

A1: Yes. We build hot runner Plastic Moulds and specialized in many different systems, such as DME,Master,Mastip,Hasco,Yudo,Incoe,Husky,etc.

The manifold recommended for your tool is selected to meet your individual needs.


Q2: What types of files do you accept (drawings)?

A2: With our CAD systems we can accept following files:

STP, IGS, DXF, DWG, Cad Key PPT, STL, X_T, CATIA, UG files, etc.


Q3: What kind of steel do you use for plastic mouldings?

A3: We can use any type of steel appointed by customer or popular in the market.

Such as P20, 718, NAK80, H13, S136, DIN 1.2738, etc.


Q4: Can you provide the steel certificate and heat-treatment certificate?

A4: Yes, We can provide steel certificate or hardness certificate to prove.


Q5: Can you make the texture / text / heat-treatment /nitriding for the inejction mold plastic?

A5: Yes, As plastic mold fatory, we have long-term cooperated subsidiary factories that do those processes.

They are professional and well reputed in our local market.


Q6: How long is the lead-time for a plastic injection mold?

A6: It all depends on the mold’s size and complexity.Normally, the lead time is 35—60days.

If the Plastic Mouldings are very simple and not big size, we can work out within 20 days.


Q7: Do you make spare parts for your customer?

A7: Yes, we will provide spare parts for the mold if needed or required by client.


Q8: How do you pack the china plastic moulds?

A8: We pack the plastic moulds with wooden box.

There are the main 3 operation steps.

First Step: We daub some rust preventive oil on the mold.

Second step: We pack the mold with thin plastic film to avoid moisture.

Third step: We put this plastic film packed mold in a wooden box, and fix it avoid any movement.

http://www.kaihaomold.com/